久久青草国产精品一区-久久青草精品免费资源站-久久青娱乐-久久厕所精品国产精品亚洲-97一本大道波多野吉衣-97一区二区三区四区久久

Language:CHINESESENGLISH

Home > News > Main reinforcement construction methods of steel workshop building reinforcement
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.kr99.cn

Main reinforcement construction methods of steel workshop building reinforcement

Time:[2022-2-17]  Hits:2723

The reinforcement of reinforced concrete structures has been seen a lot, but do you know how to do the reinforcement of steel structures? Where are the common steel workshop building reinforcements generally used? Common steel workshop building reinforcement is mostly used in cooling towers, steel workshop buildings, steel structure interlayers and other places.

The main methods of strengthening the steel workshop building are:

Reduce the load, change the calculation graphics, increase the cross-section and connection strength of the original structural members, and prevent crack propagation. When there is mature experience, other reinforcement methods can also be used.

The identified steel structures that need to be reinforced are generally divided into local reinforcement and comprehensive reinforcement according to the scope of damage. Local reinforcement is the reinforcement of a bar or connecting node with insufficient bearing capacity.

Comprehensive reinforcement is the reinforcement of the overall structure, there are two types of reinforcement methods without changing the structure static calculation graphics and changing the structure static calculation graphics. Adding or strengthening the support system is also an effective way to strengthen the structural system. The reinforcement method of increasing the original member section is the most expensive and labor-intensive method (but it is often a feasible method); the method of changing the calculation diagram is the most effective and diverse, and its cost is also greatly reduced.

The construction methods of the reinforcement structure of the steel workshop building are as follows:

Load reinforcement, unload reinforcement, and removal of parts that should be reinforced or updated from the original structure for reinforcement. The construction method for the reinforcement of the steel workshop building should be determined by the designer and the construction unit through consultation according to the user's requirements and the actual stress state of the structure, under the premise of ensuring quality and safety.

(a)Reinforcement with load: the construction is the most convenient and economical. It is used when the stress of the component (or connection) is less than 80% of the design strength of the steel, or when the component is not significantly damaged (broken, deformed, warped, etc.). At this time, in order to make the new reinforced rod participate in the force, sometimes it is necessary to take temporary unloading measures for the reinforced rod. In addition, care should be taken not to affect the normal use of other components during reinforcement.

(b) Unloading reinforcement: It is suitable for when the structural damage is large or the stress state of the components and connections is very high, and its load needs to be temporarily relieved. For some structures that mainly bear movable loads (such as crane beams, etc.), their movable loads can be limited, which is equivalent to most of the unloading.

(c) Remove the parts that should be reinforced or updated from the original structure: when the structure is severely damaged or the bearing capacity of the original section is too small, it must be reinforced or updated on the ground. At this time, temporary support must be provided to completely unload the replaced component; at the same time, the safety of the entire structure must be guaranteed after the replaced structure is removed.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 免费观看日本特色做爰视频在线 | 成人黄色免费网站 | 亚洲国产成a人v在线观看 | 欧美国产日本精品一区二区三区 | 久久影院yy6080 | 欧美日韩第二页 | 欧美高清不卡 | 三级黄色片网址 | 国产欧美亚洲精品a | 亚洲欧美在线视频 | 玖玖这里只有精品 | 看中国毛片 | 国产一级做a爰片久久毛片男 | 日韩视频一区二区三区 | 日本高清专区一区二无线 | 国产男女 爽爽爽爽视频 | 美女曰皮 | 免费看国产精品久久久久 | 成人合集大片bd高清在线观看 | 美女网站视频黄色 | 成人做爰免费网站 | 99久久国产综合精品五月天 | 亚洲国产综合精品 | 国产激情一区二区三区成人91 | 国产成人啪精品午夜在线观看 | 一级免费视频 | 男人扒开双腿女人爽视频免费 | xxx免费视频 | 成人亲子乱子伦视频 | 国产成人在线视频免费观看 | 欧日韩视频777888 | 国产欧美在线视频 | 免费观看亚洲 | 99热官网 | 亚洲成人福利在线 | 色片在线播放 | 欧美成人一区二区三区在线视频 | 免费精品一区二区三区在线观看 | 久久99久久99精品免观看 | 日韩亚洲欧美综合一区二区三区 | 韩国免费播放一级毛片 |