久久青草国产精品一区-久久青草精品免费资源站-久久青娱乐-久久厕所精品国产精品亚洲-97一本大道波多野吉衣-97一区二区三区四区久久

Language:CHINESESENGLISH

Home > News > What should be done for steel structure workshop reinforcement?
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.kr99.cn

What should be done for steel structure workshop reinforcement?

Time:[2022-11-16]  Hits:1979

It is inevitable that various problems will occur in the use of steel structure buildings, especially when they are used to a certain extent and for a certain period of time, some quality problems will inevitably occur, so what should be done to strengthen steel structure plants?

 


Before the reinforcement planning of the steel structure workshop, the reliability appraisal should be carried out in accordance with the Code for Reliability Appraisal of Industrial Buildings and the Code for Reliability Appraisal of Civil Buildings. The content and scope of the reinforcement planning should be determined according to the appraisal results; At the same time, according to the severity of the structural damage consequences and the requirements of the user, determine the safety level of the strengthened building structure.


Keep and use the original structures and components as much as possible to avoid unnecessary removal and replacement, and ensure the safety and durability of the reserved parts; Recycling and reuse of materials shall be considered for the removed parts. In consideration of comprehensive technical and economic indicators, measures shall be taken from the planning and construction organization to reduce the construction period as much as possible, and the reduction of strikes and production stoppages shall not affect the use of buildings as much as possible.


The steel structure workshop is damaged due to high temperature corrosion, freeze-thaw oscillation, uneven settlement of foundation and other reasons. The reinforcement must also consider eliminating, reducing or offsetting these adverse factors to avoid further deterioration and secondary reinforcement.

 


Then the reinforcement methods of steel structure workshop also include the following categories:


1. Enlarged section reinforcement method: this method has simple construction technology, strong adaptability, and mature planning and construction experience; It is applicable to the concrete reinforcement of beams, slabs, columns, walls and general structures;


However, the wet operation time of on-site construction is long, which has a certain impact on production and days, and the building clearance after reinforcement has been reduced to a certain extent.


2. Replacement concrete reinforcement method: the advantages of this method are similar to that of the enlarged section method, and the clearance of buildings will not be affected after reinforcement, but there is also the disadvantage of long wet operation time of construction;


It is applicable to the reinforcement of concrete bearing members such as beams and columns with low concrete strength or severe defects in the compression zone.


3. Bonded wrapped steel reinforcement method: this method is also known as wet wrapped steel reinforcement method, which is characterized by easy stress, simple construction, small on-site workload, but large steel consumption, and should not be used in high temperature places above 600C without protection;


It is applicable to the reinforcement of concrete structures that are not allowed to significantly increase the section size of the original members, but require a substantial improvement in their bearing capacity.


4. Reinforcement method by pasting steel plates: this method is fast in construction, no wet operation on site or only a few wet operations such as plastering, which has little impact on production and days, and has no significant impact on the appearance of the original structure and the original clearance after reinforcement, but the reinforcement effect depends largely on the adhesive process and operation level;


It is applicable to the reinforcement of flexural or tensile members under static force and in normal humidity environment.


5. Reinforcement method of pasting fiber reinforced plastic: in addition to the similar advantages of pasting steel plates, it also has the advantages of corrosion resistance, moisture resistance, almost no increase in the dead weight of the structure, durability, low maintenance costs, etc., but requires special fire prevention treatment, which is applicable to concrete structural members and general structures with various mechanical properties.


6. Wire winding method: the advantages and disadvantages of this method are similar to those of the enlarged section method; It is applicable to the reinforcement of concrete structural members with insufficient diagonal section bearing capacity, or the occasion where lateral restraint force is required on compression members.


7. Anchor bolt anchoring method: this method is applicable to the reconstruction and reinforcement of concrete bearing structures with concrete strength grade of C20~C60; It is not applicable to the above structures and light structures that have been severely weathered.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 午夜成年女人毛片免费观看 | 最新国产成人综合在线观看 | 色香欲综合成人免费视频 | 亚洲免费成人在线 | 亚洲综合免费 | 免费v片在线观看 | 在线成人播放毛片 | 99爱在线精品视频免费观看9 | 2019在线亚洲成年视频网站 | 97视频免费在线观看 | 女人张腿让男桶免费视频网站 | 99视频精品免视3 | 精品亚洲视频在线观看 | 怡红院自拍| 日韩精品a在线视频 | 4四虎44虎www在线影院麻豆 | 国产三级在线视频观看 | 91成人免费 | 亚洲欧美精品一中文字幕 | 97在线观看 | 2021国产成人精品久久 | 亚洲精品视频久久久 | 亚洲成人中文 | 丁香婷婷影音先锋5566 | 日韩精品中文字幕在线 | 乱子伦xxxx | 精品一区二区三区免费毛片爱 | 亚洲国产精品免费 | 精品一区二区三区免费视频 | 黄人成a动漫片免费网站 | av狼论坛| 日日爱影院| 国产精品欧美亚洲韩国日本 | 岛国片欧美一级毛片 | 成年片免费网址网站 | 亚洲欧美成人综合久久久 | 国产r67194吃奶视频 | 久久成人国产精品免费 | a级男女性高爱潮高清试 | 成 人 a v黄 色 | 国产成人丝袜网站在线观看 |