Engineering Technology: General requirements for inspection of steel structure engineering foundation

Time:[2015-1-14]  Hits:4820

Engineering Technology: General requirements for inspection of steel structure engineering foundation

     Steel installation before positioning axis response, infrastructure and elevation axes, bolt size and location of the building, such as review, and should be the basis for the handover inspection and acceptance. Such as anchor bolts required to review each bolt axis, elevation, to go beyond regulatory requirements, must take appropriate remedial measures. Such as increasing the size of the column bottom in the column base plate according to the actual location of re-drilling screws.
     When the transfer of basic engineering batches, each less than a handover acceptance column base can form the basis of the degree of spatial steel mounting unit and shall meet the following requirements: basic strength of concrete to meet the design requirements; tamp backfill around the foundation is completed; foundation the elevation and the datum axis signs and point accurate and complete; the top surface of the foundation should be flat base surface of the secondary should be watered at cutting hair, anchor bolts should be intact.
The column axis bomb test in place of the column base surface.
     The column base level for leveling. Pouring concrete column base elevation is generally reserved for 50 to 60 mm (compared with steel column base design elevation), the installation is a steel plate or take advance using slurry leveling boards.
     When using the steel plate to make the support plate, the steel plate in the area before the bottom of the column should be secondary grouting withstand tensile load and bolt tightening calculated and determined according to the following compressive strength of concrete foundation, columns soles of the feet. Base plate and the contact surface and the bottom surface of the column should be smooth, tight.
     When the syrup should be used to sit for the board using non-shrink mortar, mortar pad before lifting pillar strength should be higher than a grade basis of concrete strength and mortar pad area should be sufficient to meet the requirements of hosting.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 在线免费视频 | 亚洲无吗视频 | 国产一级一级一级国产片 | 欧美a毛片| 国产亚洲精品午夜一区 | 狠狠一区 | 国产婷婷一区二区三区 | 国产精品无打码在线播放9久 | 美国做受三级的视频播放 | 久久精品视频一区二区三区 | 国产99视频在线 | 久久久黄色大片 | 欧美jizz18性欧美 | 亚洲免费高清 | 久久精品一级 | 日本乱人伦在线观看免费 | 欧美日韩一区二区视频免费看 | 91久久国产精品视频 | 亚洲精品一区二区三区 | 国产成人a毛片 | 一区二区三区视频免费观看 | 欧美亚洲国产视频 | 一级黄色免费网站 | 在线欧美精品一区二区三区 | 色拍拍噜噜噜aⅴ在线观看 色青青草原桃花久久综合 色婷婷91 | 一级在线 | 欧洲 | 亚洲欧洲日产国码二区首页 | 亚州一二区| 男人的天堂在线 | 黄色美女视频免费看 | 国内精品久久久久影院网站 | 久久亚洲国产成人亚 | 在线观看精品自拍视频 | 欧美亚洲日本国产 | 亚洲精品一区二区三区美女 | 国产精品欧美亚洲韩国日本 | 偷自拍 | 精品视频一区二区 | 男人都懂的网址在线看片 | 亚洲波多野结衣日韩在线 | 福利片免费一区二区三区 |