久久青草国产精品一区-久久青草精品免费资源站-久久青娱乐-久久厕所精品国产精品亚洲-97一本大道波多野吉衣-97一区二区三区四区久久

Language:CHINESESENGLISH

Home > News > Guangzhou Steel teach you: connection handling, processing and Steel Works conflict face pieces
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.kr99.cn

Guangzhou Steel teach you: connection handling, processing and Steel Works conflict face pieces

Time:[2015-8-1]  Hits:5746

Guangzhou Steel teach you: connection handling, processing and Steel Works conflict face pieces


1, the connector bolt hole according to relevant provisions of Chapter 8 of this specification for processing, precision bolt hole wall roughness appearance, diameter and pitch tolerance and so on, Guangzhou steel should be consistent with existing national standards "Steel Construction Quality Acceptance "of the relevant provisions of GB50205.
2, bolt hole pitch over the provisions of this Code section 7.2.1 of the allowable error, the base material can be used to match the welding electrodes, and shall be subject to the system after re-qualified NDT holes, each hole by welding Number of re-drilling must not exceed 20% of the group the number of bolts.
3, high strength bolts conflict face contact surface voids due to the thickness tolerances and other manufacturing error or installation error occurs, provisions for processing in accordance with Table 7.2.3.
4, conflict bolts connecting surface treatment process can be selected at the design according to the requirements of the anti-slip coefficient, anti-slip coefficient should fit the design requirements. When using hand-grinding wheel, grinding direction should be perpendicular to the direction of the force and scope should not be less than 4 times grinding bolt aperture.
5, the high strength bolts connecting process after the appearance of a conflict surfaces, should be consistent with the following provisions:
(1) a connection collision surface should be dry and clean, should not have flash, burrs, weld spatter, burr, iron skin, dirt and so on;
(2) Conflict surface after treatment should take protective measures, shall be marked in conflict face;
(3) Conflict surface with rust treatment, before installation should be fine wire brush perpendicular to the direction of the force member removed rust conflicts surface. Guangzhou Steel

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 毛片手机在线 | 久久久99精品免费观看 | 欧美一级乱理片免费观看 | ririai99在线视频观看 | 欧美丰满大乳大屁股毛片 | 5x性区m免费毛片视频看看 | 在线视频精品一区 | 成年人网站在线 | 亚洲国产字幕 | 欧美一级特黄高清免费 | 最新欧美精品一区二区三区 | 欧美成人亚洲国产精品 | 国产成人亚洲日本精品 | 欧美黄成人免费网站大全 | 欧美精品人爱a欧美精品 | 亚洲成av人片在线观看无码 | 久久国产夜色精品噜噜亚洲a | 国产一级高清视频 | 绝对真实偷拍盗摄高清在线视频 | 欧美日韩另类在线观看视频 | 亚洲网站免费看 | 免费一区二区三区四区 | 国产真实乱子伦精品视 | 欧美怡红院免费全视频 | 国产在线精品一区二区中文 | 亚洲国语在线视频手机在线 | 国产va精品网站精品网站精品 | 99www综合久久爱com | 曰韩美女一级视频 | 成人免费高清视频网址 | 免费国产不卡午夜福在线观看 | 亚洲精品一区二区久久这里 | 91免费版网站 | 亚洲第一黄色网 | 韩国19禁主播裸免费福利 | 波多野结衣在线看片 | 欧美视频在线观在线看 | 久久精品人人爽人人爽快 | 免费观看欧美精品成人毛片 | 美女视频黄色免费 | 国产亚洲精品yxsp |