Housing Construction - large steel structure construction technology of installation of slip

Time:[2016-3-19]  Hits:4750

Guangzhou Steel tells you: Housing Construction - large steel structure construction technology of installation of slip

Guangzhou Steel News 1. Main content
Computer-controlled mass jacking and lifting technology is an advanced steel structure and installation of large equipment technology, which combines mechanical, hydraulic, computer control, sensor monitoring technology, and technology to solve the traditional hoisting of large crane and lifting machinery height, weight lifting, structure, surface contact, job sites and other fields insurmountable problems. With this construction technique is safe and reliable, mature technology, advanced technology, significant economic benefits. The technology uses a "flexible strand bearing, hydraulic cylinder cluster, computer-controlled synchronous lifting" principle. When lifting or jacking construction precisely controlled by computer at various points synchronization.
2. Technical Specifications
Lifting or jacking determine the program, you must also consider the load-bearing structure (permanent or temporary) and the lifting device itself or the steel strength, stiffness and stability. To make the overall force structure under construction state of stress performance checking and calculating all, to mention points with jack. For construction of foundation and support structure or the lower should be checking the bearing capacity and the overall stability, guaranteed under the most unfavorable conditions sufficient security. Sync value of each action point should be selected by calculating the reasonable construction.
Ways to enhance the principle of choice, one seeks to reduce the height of the load-bearing structure, to ensure its stability, the second is to ensure that the steel structure or equipment was promoted stability and security in place in ascension. Determine lifting points of the number and location of the basic principles are: First, to ensure that equipment is lifted steel or stability during the lift of. In ensuring the safety and quality of the premise, to minimize the lifting points. Enhance the carrying capacity of the device itself meet the design requirements. Lifting equipment selection principles are: to meet the upgrade requirements of the force, compact, durable, easy maintenance, meet the engineering needs (such as stroke, enhance the speed, security, etc.).
Main technical characteristics 3. Slip law
Sliding method has broad applicability. In addition to one-way truss, the structural rigidity for the smaller two-way truss or truss by adding support points (decrease span), increase the width of the assembly platform, while increasing the number of truss assembly on the platform, the same method can be used to install slip.
Slip propulsion device can be computer-controlled synchronized hydraulic crawler. High degree of automation equipment, flexible operation, safety, and high reliability, using a wide versatility.
4. The main technical measures slip law
1) preparation of construction plan
Preparation of construction plan to guide the construction, comprising: a sliding unit division, and slide assembly platform erection, assembly height, traction system, points slip or cumulative slip, off the shelf in place, construction monitoring, contingency plans.
2) high-altitude platform assembly and erection truss assembly.
3) Set the sliding track.
4) Install the synchronization slip system.
5) stress and strain monitoring: to ensure the construction in a controlled state.
5. Scope
(1) sports stadiums, theaters, hangars, steel bridge (gallery) and other large span roof and steel structure assembled with a ground conditions, when there are better peripheral support conditions, and can be used to enhance the overall lifting technology.
(2) enhancing the overall steel tower antenna masts, power station boilers and other ultra member.
Enhancing the overall (3) large gantry crane girder, boilers and other large equipment.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 日韩精品无码一区二区三区 | 一区二区三区免费视频播放器 | 国产蜜汁tv福利在线 | 日韩午夜三级 | 高清性色生活片久久久 | 久久综合精品不卡一区二区 | 精品视频一二三区 | 一本久综合久久爱 | www.亚色 | 国产精品久久久久久久专区 | 黄在线看 | 自拍1页 | 97婷婷狠狠成人免费视频 | 欧美黑人巨大最猛性xxxxx | 亚洲人成网国产最新在线 | 国产一区二区久久精品 | 国产午夜毛片v一区二区三区 | 欧美一级淫片免费播放口 | 国产黄a三级三级看三级 | 明星国产欧美日韩在线观看 | 在线有码 | 国产一级特黄a大片99 | 国产在线一区在线视频 | 日本综合欧美一区二区三区 | aa级毛片 | 亚洲视频在线一区二区 | 精品国产三级a在线观看 | 欧美性高清视频免费看www | 色女生影院 | 高清波多野结衣一区二区三区 | 亚洲国语在线视频手机在线 | 中日毛片 | 欧美成人久久久免费播放 | 日日摸夜夜搂人人要 | 久久亚洲国产 | 黑人特黄aa毛片 | 亚洲精品天堂自在久久77 | 手机看片1024欧美日韩你懂的 | 一区二区亚洲精品 | 亚洲三级精品 | 国产a高清 |