Foshan three steel steel truss construction method

Time:[2016-6-11]  Hits:5155

A high-altitude assembly method
Steel truss assembly method by high-altitude installation, erection is first assembled bracket design position, and then use a crane to grid member sub-element (or block) to the design position hanging in the air, were assembled on the bracket. Sometimes this method does not need large-scale lifting equipment, but the bracket assembly large amount of aerial work more. Therefore, the high strength for steel pipe truss with steel production of steel truss or bolt ball node is more appropriate, there are still a number of steel truss construction method has been applied.

Second, the overall installation method
Overall installation method is to first grid on the ground assembled into a whole, and then lifting equipment designed to enhance its overall position to be fixed. This method of construction without assembling the bracket tall, aerial less easy to ensure the welding quality, but requires a large crane lifting equipment, technology is more complex. Therefore, this method of spherical joints steel grid (especially three-grid and other bars more grid) is more appropriate. Depending on the equipment used, the overall installation method is divided into multi-machine Hoisting method, pull the lever to enhance the law, law and jack lifting jack lifting method.

Third, the high-altitude sliding method
In recent years, the use of aerial roof truss construction by parallel sliding gradually increased, it is especially suitable for theaters, auditoriums and other projects. This method of construction, the grid assembly platforms are situated in the building lobby top plate assembly (erection can be assembled on the platform assembly auditorium bleachers), to be the first assembly unit (or first stage) assembly is completed, it is about to fall on the sliding track, traction equipment from sliding forward a certain distance. Then assembled on the platform of the second assembly units (or second), after a good fight, together with the first assembly unit (or first stage) with slip forward, so ask before slipping constantly assembled piecemeal, until the entire grid assembly is completed and moved to place the slide position.

Good slip assembly grid, the grid can be set up under the carriage wheel, the roller slide on the slide rail; also in the grid holder under the seat bottom, so embedded in the bearing plate along the reinforced concrete frame beam embedded steel slide.
Slip grid or lever hoist winch available traction. According to the lever bearing capacity and traction grid size between supports, may be one or more points of traction. When the grid slip ends sync value should not exceed 50mm.

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 一本久道久久综合婷婷 | 欧美叫床戏做爰无遮挡 | mm在线视频免费看 | 欧美一区二区三区久久综合 | 视色4setv.com| 国内自拍在线 | 日韩精品在线播放 | 一级做a爰片性色毛片中国 一级做a爰性色毛片 | 久久91精品国产91久久 | 在线观看国产日韩 | 国产日韩视频在线观看 | 韩国巨胸女三级视频网 | 日韩一级免费视频 | 91久久精品国产亚洲 | 国产欧美一区二区久久 | 精品视频99 | 日韩在线不卡一区在线观看 | 亚洲欧美日韩精品久久亚洲区 | 久久精品最新免费国产成人 | 给我一个可以看片的www日本 | 日韩在线免费视频 | 网友自拍第一页 | 成人毛片免费视频 | 久久精品2 | 韩国三级大全久久网站 | 九九视频在线 | 精品国产90后在线观看 | 成熟的女性强烈交性视频 | 72种姿势欧美久久久久大黄蕉 | 欧美做爰野外在线视频观看 | a级成人高清毛片 | 99精品国产综合久久久久 | 欧美三级黄色大片 | 日本b站一卡二不卡 | 欧美自拍在线 | 国产成人v视频在线观看 | 一级中国毛片 | 中文字幕亚洲日本岛国片 | 免费国产一级特黄久久 | 天堂男人在线 | 中文字幕久久久 |