久久青草国产精品一区-久久青草精品免费资源站-久久青娱乐-久久厕所精品国产精品亚洲-97一本大道波多野吉衣-97一区二区三区四区久久

Language:CHINESESENGLISH

Home > News > Analysis on Difficulties and Safety Precautions of Foshan Steel Structure Sandwich Construction
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.kr99.cn

Analysis on Difficulties and Safety Precautions of Foshan Steel Structure Sandwich Construction

Time:[2017-1-4]  Hits:5475

Sandwich construction site in Foshan steel is often a small space, the main beam is difficult to enter, even after disconnection in the outside into the connection, the machine is not easy to use, hand-lift carry stitching after lifting.

1, take root
   Sandwich safety is one of the key "rooting", the so-called root is the new mezzanine roof load through the main beam radiation to the root, from the root spread to the original structure, like a tree without a strong root tree can not stand.

In the actual construction of the first to detect the media hardness. thickness. Reinforcement, etc., try not to interrupt the main hole when the hole, in strict accordance with the requirements of the depth of the process, diameter hole, according to the roof load configuration bolt. In the anchor must be cleared before the hole, otherwise it will seriously affect the anchorage strength, implant speed can not be too fast can cause drug mixing is not complete, too slow will cause running drugs, will reduce the pull force, after implantation According to the temperature before waiting for construction.

According to the total radiation of the main beam, the thickness and area of ​​the anchor plate are calculated. (The value of the anchor bar is higher than that of the high strength bolts, and the success rate of the reinforcing bar is low.) Of the reason) welding pallets or connecting plate to be split welding.

Installation of the anchor bolt to pull the experiment, the shear force can be carried out on the soil experiment, all anchor plate drilling hole to consider when the situation, can play less equipment, but not less than the design load. If the anchor plate and concrete beams or concrete columns can be gap between the filling or grouting material processing, all the anchor after solidification before loading the main beam.

2, the main beam

The main beam in the sandwich project is the safety key to the second, if a tree even the roots of the tree can no longer withstand external force is also in vain, the choice of the main beam and roof load, span is directly related to the span if you can choose small Cutting, primer and other treatment, to the site after the measurement of both ends of the anchor in the fine-cutting, sandwich works and other steel works is different from the majority of the beam purlin of the beam, or the H-beam steel beam to be polished, Because the box beam must be welded, high cost, weight, hoisting and transportation difficulties, the end of the attic mezzanine construction, the size of the structure of the beam, the length of the length of the indefinite length, so the measured after cutting, if the span of small to try to use steel,

3, connection

Foshan steel construction is the main steel beam connection, 1 welding, 2 high-strength bolted connection. In large projects generally use high-strength bolted or welded, because the venue and welding power to allow this is not to say, in the mezzanine site is often a small space, the main beam is difficult to enter, even after disconnection into the connection, mechanical easy to use Not on hand-lift carry stitching after lifting steel beam connection.

Foshan steel construction safety measures:

(1) construction operations should comply with safety operating procedures, must enter the scene with a helmet, smoking to the development of the smoking room, high-altitude operation of a good seat belt. To establish a prevention-oriented security awareness.

(2) check fire, fence and other safety facilities are perfect, imperfect to be trimmed or added.

(3) should be promptly cleaned up a variety of roads and roads of snow and ice, pay attention to anti-slip fall. Can not be promptly removed due to the laying of straw, wood and other non-slip measures.

(4) sand electric heating pipe should be taken to protect the grounding measures to prevent leakage.

(5) open fire should be away from combustible materials, or to take isolation measures. Strict implementation of the use of fire card system. And carry fire bucket, set up to see the fire.

(6) to protect the safety of workers, dormitory is prohibited within the electric furnace or other dangerous electrical heating equipment.

(7) to prevent frostbite in winter facilities, or gas poisoning incidents.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 国产亚洲福利精品一区二区 | 久久亚洲国产精品 | 99re热这里只有精品视频 | 亚洲国产区| 成人夜色香网站在线观看 | 久久在线资源 | 7ass欧美| a级毛片免费观看网站 | 免费久草 | 成人做爰免费网站 | 亚洲精品午夜在线观看 | 波多野结衣视频免费观看 | 日韩精品中文字幕在线观看 | 欧美成人做爰网站 | 国产精品日本欧美一区二区 | 欧美一级毛片无遮无挡 | 亚洲一区欧美一区 | 97在线公开视频 | 国产精品高清免费网站 | 色青青草原桃花久久综合 | 亚洲二区在线播放 | 性做久久久久免费看 | 国产精品毛片va一区二区三区 | 久久r这里只有精品 | 日韩毛片高清免费 | 国外精品视频在线观看免费 | 久久91精品国产91久久户 | 欧美精品久久天天躁 | 热re66久久精品国产99热 | 色拍拍噜噜噜aⅴ在线观看 色青青草原桃花久久综合 色婷婷91 | 欧美日韩中文字幕在线观看 | 国产aⅴ片 | 绝对真实偷拍盗摄高清在线视频 | 日本a级毛片视频播放 | 亚洲天堂网在线观看视频 | 久久国产欧美日韩高清专区 | 亚洲一区毛片 | 92看片淫黄大片看国产片 | 日韩久久免费视频 | 国产精品久久久久久久网站 | 精品综合|