Common problems of Foshan steel structure column base installation

Time:[2021-4-7]  Hits:3316

Installation of column base

 

(1) Embedded parts (anchor bolt) problems: overall or layout deviation; elevation error; screw thread without protective measures. The bolt holes on the bottom plate of the steel column are directly out of alignment, resulting in insufficient thread length.

 

Measures: the steel structure construction unit cooperates with the civil construction unit to complete the embedded parts work, before the concrete pouring and tamping. Relevant dimensions must be rechecked and fixed firmly.

 

(2) The phenomenon of anchor bolt not vertical: the horizontal degree of the base plate of frame column column foot is poor, the anchor bolt is not vertical, and the horizontal error of embedded anchor bolt is too large after foundation construction. The columns are not in a straight line after installation, which makes the appearance of the house difficult to see, brings errors to the steel column installation, and affects the structural stress, which does not meet the requirements of the construction acceptance specification.

 

Measures: the anchor bolt installation should adhere to the bottom plate leveling with the lower adjustment bolt, and then the secondary grouting of non shrinkage mortar, and the construction method abroad. Therefore, during the construction of anchor bolt, steel bar or angle steel can be used to fix anchor bolt. Welding into a cage, improving the support, or taking some other effective measures to avoid the anchor bolt moving one place when pouring the foundation concrete.

 

(3) Anchor bolt connection problems: the anchor bolt of column base is not tightened, the base plate is not welded with the bottom plate; some anchor bolts with 2-3 threads are not exposed.

 

Measures: Welding bolts and nuts shall be adopted; outside chemical anchor bolts, fire-proof coating and heat insulation treatment shall be added to prevent the anchorage performance from being affected by fire; observation data of foundation settlement shall be supplemented.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 欧美区一区二 | 一区二区三区中文国产亚洲 | 久草视频免费在线观看 | 国产成人在线播放视频 | 色综合亚洲七七久久桃花影院 | 国产精品露脸脏话对白 | 日韩免费三级 | 亚洲羞羞裸色私人影院 | 手机看片福利永久 | 成人黄色免费网址 | 亚洲欧美视频在线播放 | 97在线视频免费 | 久久午夜影视 | 亚洲一级毛片免费看 | 久久综合婷婷香五月 | 久久久久在线 | 三级精品在线观看 | 日本在线看小视频网址 | 欧美国产日本精品一区二区三区 | 久久精品视频2 | 免费黄色美女视频 | 九九在线观看精品视频6 | 中文字幕视频免费在线观看 | 欧美成人se01短视频在线看 | 韩日一级视频 | 亚洲欧美一区二区久久香蕉 | 欧美成人自拍视频 | 在线一区播放 | 欧美一区二区三区在线视频 | 亚州久久 | 国产在线观看网址你懂得 | xxxwww黄色| 日韩中文字幕网站 | 国产最猛性xxxxxx69交 | 欧美日韩在线视频观看 | 操美国女人 | 日韩一区国产二区欧美三区 | 国产67194 | 亚洲无线一二三区2021 | 国产成人久久精品激情91 | 国产在线一区二区 |