久久青草国产精品一区-久久青草精品免费资源站-久久青娱乐-久久厕所精品国产精品亚洲-97一本大道波多野吉衣-97一区二区三区四区久久

Language:CHINESESENGLISH

Home > News > During the installation of steel structure, the following problems shall be paid attention to:
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.kr99.cn

During the installation of steel structure, the following problems shall be paid attention to:

Time:[2021-8-28]  Hits:2954

During the installation of steel structure, the following problems shall be paid attention to:

1. Before the installation of steel structure, all members shall be comprehensively inspected, such as whether the number, length, perpendicularity of members and the size between bolt holes at installation nodes meet the design requirements; The defects generated during fabrication and deformation generated during transportation shall be corrected on the ground and properly solved.

2. The steel column and foundation are generally connected by embedded anchor bolts. Therefore, before installing the steel column, check the size between the column base bolts, whether the length exposed to the foundation surface, the elevation of the foundation top meet the design requirements, and whether the thread of the column base anchor bolt is damaged (generally, measures are taken during foundation construction to protect the column base anchor bolt and its thread from being damaged).

3. When hoisting the steel structure, proper measures shall be taken to prevent excessive bending and torsion deformation. The contact part between the rope buckle and the component shall be padded with cushion blocks to prevent the component from being damaged.

4. After the steel structure is hoisted in place, the support and other connecting members shall be fastened in time to ensure the stability of the structure.

5. The hoisting of all superstructure can only be carried out after the substructure is in place, corrected and fastened with supporting members.

6. Assemble a large installation unit on the ground according to the lifting capacity of the site installation machinery to reduce the workload of high-altitude operation.

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號(hào)
主站蜘蛛池模板: 最近免费手机中文字幕3 | 一级做a毛片在线看 | 久久久黄色片 | 国产情侣久久 | 国产精品无码久久久久 | 色视频一区二区三区 | 亚洲欧美韩国 | 久草免费在线播放 | 欧美一级aa天码毛片 | 成年女人免费视频 | 欧美日韩中文字幕在线视频 | 欧美性色黄大片www 欧美性色黄大片一级毛片视频 | 理论片免费午夜 | 日本高清视频一区二区 | 久久精品成人免费网站 | 成人高清视频在线观看 | 久草免费在线视频观看 | 国产三级在线观看视频 | 中文精品视频一区二区在线观看 | 久久怡红院 | 国产精品1区2区3区 国产精品1区2区3区在线播放 | 欧美日韩一区二区三区在线视频 | 国产网曝手机视频在线观看 | 亚洲成人中文字幕 | 天天夜天干天天爽 | 日韩国产精品欧美一区二区 | 欧美一级毛片日韩一级 | 欧美色大成网站www永久男同 | 亚洲品质自拍视频网站 | 经典三级在线视频 | 美女张开腿让男人 | 一区二区精品在线观看 | 免费视频成人国产精品网站 | 精品国产欧美一区二区三区成人 | 91精品国产免费久久久久久 | 欠草视频| 国产精品视频免费 | 在线精品国产成人综合第一页 | 国产99视频精品免费观看9e | 国产成人综合手机在线播放 | 亚洲国产综合精品 |