Installation details that must be paid attention to in steel structure processing

Time:[2021-9-22]  Hits:2602

Installation details that must be paid attention to in steel structure processing

In the construction of steel structure engineering, there are many details to pay attention to, especially in the installation process. We need to carefully operate and inspect the steel structure before, during and after installation.

1. Before the installation of steel structure processing members, the quality of steel members shall be checked. In case of deformation and defects, the steel members shall be measured and corrected according to the engineering characteristics within the range of allowable deviation. For the welding of thick steel plate and dissimilar steel plate and the main process of high-strength bolt installation, the process test shall be carried out before installation, and the corresponding key points of construction process shall be prepared.

2. When the expanded assembly unit is used for installation, the strength and stability of steel members that are easy to deform shall be checked, and reinforcement measures shall be taken when necessary; During the comprehensive installation of steel members, it shall be divided into several independent units. After the installation of all steel members of each unit, a spatial stiffness unit shall be formed.

3. During steel structure processing, the columns, beams, roof trusses, supports and other main components of steel members shall be corrected and fixed immediately after they are installed in place. The steel members installed on the same day form a stable space system. During the installation and correction of steel structure, corresponding adjustment measures shall be taken according to the influence of external environment such as wind force, temperature difference and sunshine and welding deformation.

4. When using the installed steel structure to hoist other components and equipment, the consent of the design unit shall be obtained, the checking calculation shall be carried out, and corresponding measures shall be taken.

5. During steel structure processing, 70% of the contact surfaces of the nodes tightened according to the design requirements shall be close to each other. Check with a 0.3mm thick feeler gauge, and the sum of the insertable areas shall not be greater than 30% of the total contact jacking area; The edge clearance shall not exceed 0.8mm.

6. When installing high-strength bolts, the bolts shall freely penetrate into the holes and shall not be used as temporary installation bolts. At the same time, the installation of high-strength bolts shall be tightened in sequence, and shall be tightened outward in the order of the center of the bolt group, and the final tightening shall be completed on the same day.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 中国人免费观看高清在线观看二区 | 国产免费自拍视频 | 日本免费高清视频二区 | 免费一级欧美大片在线观看 | 手机在线观看黄色网址 | 91精品国产免费久久久久久 | 欧美videofree性欧美另类 | 综合亚洲欧美日韩一区二区 | 国产成人啪精品午夜在线观看 | 日本视频一区二区三区 | 亚洲mm8成为人影院 亚洲m男在线中文字幕 | 欧美成人片在线 | 国产永久高清免费动作片www | 成人午夜亚洲影视在线观看 | 国产欧美成人不卡视频 | 美女一级毛片 | 久色视频在线 | 手机看片1024久久精品你懂的 | 手机在线精品视频 | 国产成人午夜精品5599 | 国产亚洲欧美日韩国产片 | 亚洲精品一区二区在线观看 | 亚洲无线一二三区2021 | 国产啪在线 | 成人国产亚洲欧美成人综合网 | 国产精品高清免费网站 | 亚洲午夜久久久久影院 | 天干天干天啪啪夜爽爽色 | 亚洲综合第一欧美日韩中文 | 久久免费视频在线 | 日韩久久精品 | 91久久精一区二区三区大全 | 国产日韩欧美综合一区二区三区 | 国产成人永久免费视频 | 精品一区二区三区在线观看l | 91香蕉视频免费 | 亚洲性久久久影院 | 欧美a欧美| 国产精品一区二区三区高清在线 | 欧美丰满大乳大屁股毛片 | 国产中文字幕视频在线观看 |