久久青草国产精品一区-久久青草精品免费资源站-久久青娱乐-久久厕所精品国产精品亚洲-97一本大道波多野吉衣-97一区二区三区四区久久

Language:CHINESESENGLISH

Home > News > Steel structure warehouse hoisting process and hoisting plan-Chapter 1
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.kr99.cn

Steel structure warehouse hoisting process and hoisting plan-Chapter 1

Time:[2021-9-25]  Hits:3047

Hoisting process

 

Positioning --- Calibration Height --- Column Top Bolt Embedded --- Calibration Height - Elastic Line - Column Installation - Steel Beam Installation - Secondary Structure Installation --- --Welding----Repainting----Completion

 

 

Steel column installation process


A,Lifting of steel columns

 

1.Re-test the foundation, including the exposed length of the anchor bolt, the displacement deviation of the anchor bolt center line to the reference line, the distance between the anchor bolts, and the foundation elevation. The unqualified ones can be handled before lifting.

 

2.In order to control the installation elevation of the column, a 500mm position is also marked on the visible cross section of the column in advance for fine-tuning and correction of the elevation during installation. Install the steel column on the basis of qualified retest, first tie the column with a single steel wire rope, and choose the position of the lifting point at a position 1/3 of the length of the column from the end of the column. The column is lifted by the rotation method, and the steel column is lifted and sent to the installation position. The lashing place should be padded.

 

 

B, the correction of the steel column

 

1.Draw the center line in advance on the visible surface of the column, and then use the theodolite to adjust the verticality of the column in two mutually perpendicular directions.

 

2.Control the verticality of the column by measuring the distance between the inner side of the column and the control line on the building.

 

3.The adjustment of the elevation, axis and verticality deviation of the column are related to each other, and the correction work will be completed when all the standards are met.

 

 

Steel beam installation process

 

Unload the steel beams to the vicinity of each column, hoist them to the floor with a car, and then install them by mast cranes. The main beams with some heavy components can be platform craned with car cranes. The secondary beam can be installed with a self-made wheeled crane (5t). Starting from the third zone, the main girder, the secondary girder and then the purlin, the steel girder shall be hoisted by masts one by one according to the number. Only when the two ends of the girder are fastened with bolts (or spot welded firmly), the hooks can be loosened and the others are hoisted in sequence Steel beams. Weld after passing the inspection.
The lashing and hoisting points of steel beams are particularly important. Steel poles can be used when the steel beams are too long. There are many steel beams in this project with a maximum length of about 20m. A triangular hanging plate is used to enlarge the distance between the steel ropes to increase the angle of the steel ropes. Require. Schematic diagram of steel beam lashing.

 


Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 久久久久欧美精品观看 | 成人男女网18免费91 | 欧美黄色一级在线 | 亚洲精品久久久久综合中文字幕 | 欧美在线一区二区三区不卡 | 免费看一级做a爰片久久 | 中文字幕亚洲国产 | 俄罗斯一级毛片免费播放 | 久久精品国产精品亚洲人人 | 最新国产美女肝交视频播放 | 欧美日韩在线播一区二区三区 | 2022国产精品自拍 | 美女视频永久黄网站在线观看 | 日本一区二区免费在线观看 | 免费看a网站 | 特黄特级a级黄毛片免费观看多人 | 久久频这里精品香蕉久久 | 男女毛片免费视频看 | 欧美成人爽毛片在线视频 | 免费毛片全部不收费的 | 欧美一级在线观看 | 久草网站 | 中文在线视频 | 亚洲精品成人a在线观看 | 亚洲视频黄 | 草草国产成人免费视频 | 日韩一级片在线观看 | 亚洲另类激情综合偷自拍图 | 日本免费大黄在线观看 | 免费人成在线观看网站 | 欧美在线播放视频 | 欧美a在线看 | 精品国产免费一区二区三区 | 99久久香蕉国产线看观香 | 亚洲 欧美 日韩 丝袜 另类 | 国产精品久久久久久久久99热 | 国产中文99视频在线观看 | 成人男女网18免费看 | 99热久久国产精品免费观看 | 欧美又粗又硬又大久久久 | 免费在线黄色网址 |